EXTENDED: Solicitation Due Date and Time: April 25, 2023 by 2:00 p.m. EST The purpose of this document is to provide general and specific information for the Town of Black Mountain Charlotte Street Sidewalk Construction Project. All bids and contracts are governed by Town of Black Mountain policy and Section 143-131 of the North Carolina General Statutes. The Town is seeking proposals to construct a sidewalk along a portion of Charlotte Street in Black Mountain. The area is adjacent to school property so care must be taken to avoid blocking traffic and safety measures followed. - Sidewalk:
- Install approximately 360 linear feet (0.68 miles) of concrete sidewalk along the East side of Charlotte Street from Village Way to E. State Street. The sidewalk shall be 5’ wide and constructed to NCDOT and ADA design standards. The drawing at the top of page 8 shows only a small depiction of section 848 of the NC Department of Transportation specifications for roads and structures.
- Sidewalk must comply with 2010 ADA standards for accessible design.
|
|
3/21/2023 12:00 AM
|
|
4/25/2023 2:00 PM
|
|
Submit responses to projects@tobm.org by 2pm EST, April 25, 2023
|
|
04/25/2023
|
|
04/10/2023
|
|
Angela Reece, Project & Facilities Manager projects@tobm.org or by phone 828-419-9300 x 315
|
|
YES
|
|
RFP, Recorded Easement, Plat , Black Mountain Purchasing Terms & Conditions
|
|
M-F 8 a.m. to 5 p.m.
|
|
Must be licensed contractor in NC.
|
|
Must comply with the Town of Black Mountain Purchasing Terms and Conditions which may be found on the Town's website at: https://www.townofblackmountain.org/170/Accounts-Payable
|
|
|